November 14, 2024
1) Short operation cycle. The aluminum formwork system is a quick formwork removal system. A set of formwork can be used for four days / layer for routine operation. At the same time, it can carry out assembly line operation well, further improve the project progress and save management costs.
2) It is used frequently and generally at a low price. The aluminum die system uses the aluminum alloy profile produced by the overall extrusion as the raw material. What is the role of the aluminum film plate pin? A set of standard formwork operations can be used for more than 300 times. The purchase price of a set of templates is shared equally, which saves a lot of costs compared with traditional templates.
3) Convenient and fast operation. The aluminum mold system is simple and convenient to assemble, with a general weight of about 20kg. It is completely handled and assembled manually without the help of any equipment. The operation method of aluminum membrane plate pin is simple. At the same time, the control system is simple, and the workers' hands-on speed and template turnover are fast. Skilled installation workers can assemble 20-30 square meters per person per day, greatly saving labor costs.

Related News
Hot-Sale Product

